Tue. Apr 29th, 2025
TDOT said the I-55 Bridge over the Mississippi River will close from 8 p.m. on Sunday, June 9 through 8 p.m. Sunday, June 23, 2024.

I-55 Bridge to close for two weeks in June for construction work

 Kim Chaney

MEMPHIS, Tenn. — Mid-South drivers should prepare for a closure of the I-55 bridge as construction work continues on the I-55 and Crump interchange.

The Tennessee Department of Transportation said the I-55 Bridge over the Mississippi River will close from 8 p.m. on Sunday, June 9 through 8 p.m. Sunday, June 23, 2024. TDOT said crews will be doing hydro-demolition and deck repair work on the bridge.

Here’s what driver’s need to know:

  • I-55 SB will be closed at Bridgeport Road in Arkansas
  • I-55 NB will be closed at South Parkway* in Tennessee
    • *Local traffic will be allowed to continue to the McLemore exit
  • I-55 SB ramp will be closed.
  • Crump Boulevard WB will be closed**
    • A detour will be posted.

Traffic Pattern

I-55 SB outside lane will be closed from the west end of the I-55 Bridge through the project site. The SB inside lane will cross-over at the east end of the I-55 Bridge and share the current I-55 NB cloverleaf ramp with I-55 NB and utilize the inside lane of the future I-55 NB from the cloverleaf to the south end of the project.

  1. I-55 NB outside lane of cloverleaf ramp will be closed to allow for I-55 SB use and the outside lane will remain closed to the west end of the I-55 Bridge.
  2. Wisconsin Avenue is opened.
  3. Crump Boulevard from Kentucky St. to Metal Museum Drive is closed.
  4. Metal Museum Drive from Alston to I-55 NB is closed.
  5. Riverside Drive SB will remain closed at Carolina.
  6. Riverside Drive NB will remain closed to Carolina.
  7. Channel 3 ramp to Riverside Drive SB will remain closed.
  8. Channel 3 ramp from Riverside Drive SB will remain closed. 

Leave a Reply

Your email address will not be published.

Connect With Us

Stay Connected Everywhere With Us